Construction > Case Studies > Education & Childcare
Education & Childcare

Friston Building, University of Sussex

University of SussexTemporary 2 storey modular building for staff and students to decant into during a major reconstruction and modernisation programme. Constructed in just 18 weeks it housed offices, lecture rooms and study facilities.

View PDF pdf

Size: 2800m2

Cost: £1,500,000

Contract Period: 20 weeks


Our Lady’s Pre-School, Northfleet, Kent

Our Ladys Pre-schoolAn attractive single story modular nursery building. This cedar clad pre-school building was designed to be self-contained with a reception area, office, store, toilets and a main classroom area. It is surrounded by a tarmac path and boasts an all-weather outdoor rubber play area.

View PDF pdf

Size: 151m2

Cost: £198,000

Contract Period: 7 weeks


Tadworth Primary School, Surrey

Tadworth Primary SchoolThis refurbished modular double classroom block was installed during the school summer holidays to minimise disruption to the school.  The spacious classrooms each feature a sink, smart board, access to a shared toilet area and double doors leading out onto the adjacent playing field.

Size: 176m2

Cost: £137,000

Contract Period: 7 weeks


Westchester House Nursery, Farnham,Surrey

Westchester House NurseryThis high quality timber frame nursery required an innovative external works package to overcome a 6m site cross-fall. Externally clad in natural brick finish and Ashler grooved render it features both solar PV and solar thermal systems.

View PDF pdf

Size: 581m2

Cost: £1,000,000

Contract Period: 36weeks


Darrick Wood School, Bromley

Darrick Wood School_01A traditional building within an existing school designed to house a hearing impaired unit. This attractive looking building features a living green roof with brick and timber external finishes.

View PDF pdf

Size: 565m2

Cost: £1,400,000

Contract Period: 38 weeks


Ellington Infants School

Ellington Infants SchoolA traditional build 3 classroom extension featuring sun pipes, round skylights and roof windows

Size: 500m2

Cost: £550,000

Contract Period: 24 weeks


St Joan of Arc RC School

Ellington Infants SchoolThis high quality drama studio was the first of a number of projects that GML has undertaken on behalf of the school. Elevated 1.2m above existing ground levels, as it is located on a flood plain this steel frame building has timber frame infill panels and an external brick plinth. Internally, the new drama studio has a suspended floor and a 55Db acoustic screen that will allow it to be divided into two autonomous studios.

Size: 225m2
Cost: £400,000

Contract Period: 36 weeks
External: Steel frame building with timber infills and external brick plinth.


Speldhurst Primary School , Tunbridge Wells – a 2 classroom timber frame extension View PDF pdf

Kidi Karu Day Nursery, Burgess Hill – 2 storey timber frame building. View PDF pdf

Heathfield Community College, E. Sussex – 2 storey timber frame library & IT suite. View PDF pdf

Langley Park School for Boys – 3 classroom timber frame technology block. View PDF pdf

Caldecotte Lake Nursery – 2 storey purpose built nursery. View PDF pdf

South Malling Primary School – Timber panelled building with brickwork skin. View PDF pdf

Rushmore Primary School – Innovative single storey timber frame extension with screw pile foundations. View PDF pdf

Oasis Academy, Enfield – Temporary 2 storey modular secondary school with 6m high gymnasium. View PDF pdf

Jack & Jill Pre –School, Wiltshire – single storey modular nursery View PDF pdf

Bishopsdown Primary School – Volumetric double classroom. View PDF pdf

Tadworth Primary School – Refurbished modular double classroom.

Brook Childrens Centre – Single storey timber frame sustainable development. View PDF pdf

Hollymount Primary School – single storey, cedar clad modular building with screw pile foundation. View PDF pdf

Knowle Park Infants School – single storey modular library with stoneflex panelling. View PDF pdf

Wilsons School, Wallington – Modular changing room block with brick slip finish. View PDF pdf

Loseley Fields Primary School – Modular classrooms with pitched roof. View PDF pdf

Joseph Hood Primary School – Flat roofed modular classroom with cedar cladding. View PDF pdf

If you cannot see an example of the type of building you require, please contact us to discuss your requirements in more detail.

 

GML Construction is a principal contractor and developer, providing a complete and cost effective solution for your building needs. We always deliver the highest quality service, from the preliminary site visit right through to construction and post handover management in:

Principal Construction: New build projects and major extensions incorporating modern and traditional construction techniques.

Timber Frame Construction: A faster and more efficient construction process whose environmental and sustainability credentials are second to none.

Modular and Relocatable Buildings: Low cost, high quality, flexible and quickly installed space solutions.

Renewable Energy Solutions: GML designs, supplies and installs renewable energy systems either as part of a construction project or as a retrofit.

Our highly experienced and qualified teams also offer an extensive turnkey client advisory service for design, planning and value engineering. GML guarantee to provide exciting and innovative buildings within budget, on time and without compromise.

To take advantage of our friendly and professional service, please call now on:

0845 685 8100