Friston Building, University of Sussex
Temporary 2 storey modular building for staff and students to decant into during a major reconstruction and modernisation programme. Constructed in just 18 weeks it housed offices, lecture rooms and study facilities.
View PDF 
|
Size: 2800m2
|
Cost: £1,500,000
|
Contract Period: 20 weeks
|
Our Lady’s Pre-School, Northfleet, Kent
An attractive single story modular nursery building. This cedar clad pre-school building was designed to be self-contained with a reception area, office, store, toilets and a main classroom area. It is surrounded by a tarmac path and boasts an all-weather outdoor rubber play area.
View PDF 
|
Size: 151m2
|
Cost: £198,000
|
Contract Period: 7 weeks
|
Tadworth Primary School, Surrey
This refurbished modular double classroom block was installed during the school summer holidays to minimise disruption to the school. The spacious classrooms each feature a sink, smart board, access to a shared toilet area and double doors leading out onto the adjacent playing field.
|
Size: 176m2
|
Cost: £137,000
|
Contract Period: 7 weeks
|
Westchester House Nursery, Farnham,Surrey
This high quality timber frame nursery required an innovative external works package to overcome a 6m site cross-fall. Externally clad in natural brick finish and Ashler grooved render it features both solar PV and solar thermal systems.
View PDF 
|
Size: 581m2
|
Cost: £1,000,000
|
Contract Period: 36weeks
|
Darrick Wood School, Bromley
A traditional building within an existing school designed to house a hearing impaired unit. This attractive looking building features a living green roof with brick and timber external finishes.
View PDF 
|
Size: 565m2
|
Cost: £1,400,000
|
Contract Period: 38 weeks
|
Ellington Infants School
A traditional build 3 classroom extension featuring sun pipes, round skylights and roof windows
|
Size: 500m2
|
Cost: £550,000
|
Contract Period: 24 weeks
|
St Joan of Arc RC School
This high quality drama studio was the first of a number of projects that GML has undertaken on behalf of the school. Elevated 1.2m above existing ground levels, as it is located on a flood plain this steel frame building has timber frame infill panels and an external brick plinth. Internally, the new drama studio has a suspended floor and a 55Db acoustic screen that will allow it to be divided into two autonomous studios.
|
Size: 225m2 Cost: £400,000
|
Contract Period: 36 weeks External: Steel frame building with timber infills and external brick plinth.
|
Speldhurst Primary School , Tunbridge Wells – a 2 classroom timber frame extension View PDF 
Kidi Karu Day Nursery, Burgess Hill – 2 storey timber frame building. View PDF 
Heathfield Community College, E. Sussex – 2 storey timber frame library & IT suite. View PDF 
Langley Park School for Boys – 3 classroom timber frame technology block. View PDF 
Caldecotte Lake Nursery – 2 storey purpose built nursery. View PDF 
South Malling Primary School – Timber panelled building with brickwork skin. View PDF 
Rushmore Primary School – Innovative single storey timber frame extension with screw pile foundations. View PDF 
Oasis Academy, Enfield – Temporary 2 storey modular secondary school with 6m high gymnasium. View PDF 
Jack & Jill Pre –School, Wiltshire – single storey modular nursery View PDF 
Bishopsdown Primary School – Volumetric double classroom. View PDF 
Tadworth Primary School – Refurbished modular double classroom.
Brook Childrens Centre – Single storey timber frame sustainable development. View PDF 
Hollymount Primary School – single storey, cedar clad modular building with screw pile foundation. View PDF 
Knowle Park Infants School – single storey modular library with stoneflex panelling. View PDF 
Wilsons School, Wallington – Modular changing room block with brick slip finish. View PDF 
Loseley Fields Primary School – Modular classrooms with pitched roof. View PDF 
Joseph Hood Primary School – Flat roofed modular classroom with cedar cladding. View PDF 
If you cannot see an example of the type of building you require, please contact us to discuss your requirements in more detail.
|