Maybridge Community Centre, Worthing
A steel and timber frame building with sedum roof boasts extensive facilities including cafe, sports hall, IT suite, clinic, art and craft room and an aerobics area.
View PDF 
|
Size: 420m2
|
Cost: £623,000
|
Contract Period: 28 weeks
|
High Ashurst Outdoor Activity Centre
A timber frame visitor centre and 3 accommodation blocks featuring timber cladding, floating wood floors, timber decking and wood shingle/shake roofing. It also has an environmentally friendly, state of the art biomass boiler.
View PDF 
|
Size: 1130m2
|
Cost: £2,500,000
|
Contract Period: 38 weeks
|
Church End Medical Centre
A modular build medical facility with brick finish walls and metal roof.
|
Size: 131m2
|
Cost: £198,000
|
Contract Period: 10 weeks
|
Bewl Water Education Centre
A timber frame, timber clad facility providing 24 bed overnight accommodation, catering facilities, lecture rooms, workshops and changing rooms.
View PDF 
|
Size: 1000m2
|
Cost: £1,042,000
|
Contract Period: 34 weeks
|
BEECHE, Bromley
Winner of the ‘Green Guardian’ award this flagship project delivers environmental education to the local community. The project is constructed with a ‘Green Roof’ made of grass/sedum and earth. Built on a timber load bearing platform that acts as the compressing force on the straw bales, known as a ‘Hybrid System’, the building is heated by a woodchip burner. View PDF 
|
Size: 460m2
|
Cost: £511,000
|
Contract Period: 26 weeks
|
If you cannot see an example of the type of building you require, please contact us to discuss your requirements in more detail.
|